Skip to main content
Site logo

Main navigation

  • About
  • News
  • Campaigns
  • Surgeries
  • Policy and Campaign Responses
  • Contact
Site logo

Richard writes to Govia Thameslink Rail about recent service levels affecting Sandy and Biggleswade stations

  • Tweet
Monday, 23 June, 2025
  • Local News
Letter to GTR June 2025

Richard has written to Govia Thameslink Railway (GTR) to follow up on the discussions he had with them in Parliament towards the end of last year.

After receiving a growing number of concerns from local residents about delays, cancellations, and skip-stopping affecting Sandy and Biggleswade stations, Richard has asked GTR for a clear update on what’s being done to improve reliability and consistency on the Peterborough line. In his letter addressed to GTR's Network Operations Director and Head of Strategic Planning, Richard refers back to discussions held in Parliament last October and asks for progress on several key areas including ongoing driver shortages, the impact of varying employment terms across the network, and the uncertainty caused by the current franchise contract. He also highlights concerns around the exclusion of Sandy from additional peak-time services, the influence of passenger demand on future timetables, and problems with Sunday services to Horsham. Additionally, Richard requests an update on the promised improvements in how service disruptions are communicated and how GTR have addressed confusion around compensation and the limitations of the Delay Repay scheme.

In addition to this letter, Richard is arranging a follow-up meeting with GTR to continue discussions on improving rail services.

You can read the letter in full here. 

Attachments

Attachment Size
Letter to GTR (581.9 KB) 581.9 KB

You may also be interested in

Train.jpg

GTR Train Services in Biggleswade and Sandy

Rail services on the Govia Thameslink Railway (GTR) network have long been a source of frustration for residents, particularly those who use Sandy and Biggleswade train stations.
tap image

Upcoming Anglian Water works in Moggerhanger and Blunham

Wednesday, 1 October, 2025
Anglian Water are investing around £1.56 million in the Moggerhanger and Blunham areas to reinforce 5.8 kilometres of the existing sewer network and help stop groundwater infiltration impacting their pumping stations.

News

  • Podcast

Show only

  • Articles
  • Local News
  • Newsletters
  • Opinions
  • Reports
  • Senedd News
  • Speeches
  • Speeches in Parliament
  • Westminster News

Richard Fuller MP North Bedfordshire

Footer

  • About RSS
  • Accessibility
  • Cookies
  • Privacy
  • About Richard
  • In Parliament
ConservativesPromoted by Katherine Arnold on behalf of Richard Fuller both at NBCA, Biggleswade Conservative Club, St Andrews Street, Biggleswade SG18 8BA
Copyright 2025 Richard Fuller MP North Bedfordshire. All rights reserved.
Powered by Bluetree