Skip to main content
Site logo

Main navigation

  • About
  • News
  • Campaigns
  • Surgeries
  • Policy and Campaign Responses
  • Contact
Site logo

Ground investigations for East West Rail in Bedford Borough resume in April after pause following Cleat Hill tragedy

  • Tweet
Sunday, 6 April, 2025
  • Local News
Image of EWR Ground investigations notice

East West Rail (EWR) recently contacted Richard to advise him that from April they would begin the first phase of ground investigations for the railway in Bedford Borough, following a three month pause in Bedford borough in December 2024 as a result of the Cleat Hill tragedy.

Ground investigations are required to provide information about the soil, rock, and groundwater below the surface to help in the design of the railway and to draw up designs that reduce project costs, construction risks, and the amount of land needed.

Richard Fuller MP said:

Ground investigations in Bedford Borough were paused following the tragic incident at Cleat Hill in October 2024. I wrote to EWR in December 2024 raising my concerns about borehole drilling in Ravensden following the tragic events at Cleat Hill which led to the works being paused. I then met with EWR this February to understand the precautions and mitigations they would be undertaking in order to restart the investigations. That delay has given EWR more time to consider and apply additional safety precautions that go beyond standard industry practice. The period has been used to work with geotechnical experts to review procedures and implement robust and safe methods of operation for drilling boreholes and managing ground gas risk.

EWR have committed to work closely with local landowners to make specific arrangements ahead of any ground investigations on their land, including treating landowners, their land, property and personal data with respect; making health and safety a priority; being clear and transparent with landowners; and keeping potential damage or disruption to their land to a minimum. The ground investigations are expected to take place over several months, with the duration of individual surveys varying depending on the type of investigation. I am told it is unlikely that they will cause any significant disturbance to communities and working hours are strictly limited to 8am to 6pm Monday to Friday.

If you are affected by these ground investigations, please let me know your feedback at [email protected] on whether the process is as safe, respectful and considered as EWR have assured me it will be.

You can find out more about the tragic incident at Cleat Hill at https://www.richardfuller.co.uk/campaigns/cleat-hill

You can read about Richard's concerns in December 2024 with the borehole drilling investigations at https://www.richardfuller.co.uk/news/richard-meets-east-west-rail-discuss-borehole-drilling-ravensden

Richard's view on East West Rail can be read at https://www.richardfuller.co.uk/ewr

 

You may also be interested in

Cleat Hill

Cleat Hill Gas Explosion

Following the tragic gas explosion in Cleat Hill on 19 October 2024, in which two residents lost their lives, Richard has been actively working to address the issues raised by this devastating event.
Richard Fuller MP with Cllr Adam Zerny and Beds MPs

Richard signs joint letter to Angela Rayner with Cllr Adam Zerny & Blake Stephenson MP calling for better infrastructure support for Central Bedfordshire

Friday, 27 June, 2025
Richard recently met with Central Bedfordshire Council leader, Cllr Adam Zerny, and fellow Bedfordshire MPs to discuss the scale of housing development that has taken place across the county in recent years and how the necessary infrastructure to support this growth has fallen far short of required

News

  • Podcast

Show only

  • Articles
  • Local News
  • Newsletters
  • Opinions
  • Reports
  • Senedd News
  • Speeches
  • Speeches in Parliament
  • Westminster News

Richard Fuller MP North Bedfordshire

Footer

  • About RSS
  • Accessibility
  • Cookies
  • Privacy
  • About Richard
  • In Parliament
ConservativesPromoted by Katherine Arnold on behalf of Richard Fuller both at NBCA, Biggleswade Conservative Club, St Andrews Street, Biggleswade SG18 8BA
Copyright 2025 Richard Fuller MP North Bedfordshire. All rights reserved.
Powered by Bluetree