Skip to main content
Site logo

Main navigation

  • The Economy
  • About
  • News
  • Campaigns
  • Surgeries
  • Policy and Campaign Responses
  • Contact
  • facebook
  • instagram
  • youtube_channel
Site logo

Richard shares his views on future road investment in North East Bedfordshire

  • Tweet
Friday, 17 September, 2021
  • Local News
Black Cat

This week, Richard attended a roundtable meeting with Baroness Vere, the Parliamentary Under Secretary of State at the Department for Transport, about the development of the third Road Investment Strategy (RIS3).

The Infrastructure Act 2015 requires the Government to set periodic Road Investment Strategies through which it lays out its strategic vision for the Strategic Road Network (SRN). These are nationally important roads, including most motorways and trunk ‘A’ roads, which are operated and cared for by National Highways. Work is now starting on developing the third such strategy, RIS3, which will cover the period from 2025 to 2030.

The meeting was an opportunity for MPs to understand the process for developing RIS3 and to share their priorities in order to shape the development of the strategy for their areas of the country from its earliest stages,

Richard Fuller, MP for North East Bedfordshire, said:

During the meeting with the Minister and senior officials from the Department for Transport, I argued that the focus of the strategy should be discrete improvements that are modest, local and meaningful, not be top-down 'grand projects'.

I added that the OxCam Arc idea no longer suits the times and the government should explicitly drop it. I also made a plea to put even more focus on mitigation during the construction of the Black Cat works.

Finally I made the point that the pressures from Black Cat and population growth locally mean it is time for RIS3 to consider options for the future of the A1.

If you would like to have your say on the future of our road network, please complete this National Highways survey.

You may also be interested in

Black Cat A1 diversion map

A1 North and Southbound closed this weekend

Thursday, 25 June, 2026
The A1 north and southbound at Black Cat will be closed between Wyboston and Tempsford from 9pm on Friday 26th to 5am on Monday 29th June 2026 for drainage works and kerb installation. Please use the diversions that are in place:𝐀𝟏 𝐧𝐨𝐫𝐭𝐡𝐛𝐨𝐮𝐧𝐝:at Black Cat take A421 westbound towards Renholdexit

News

  • Podcast

Show only

  • Articles
  • Holyrood News
  • Local News
  • Newsletters
  • Opinions
  • Reports
  • Senedd News
  • Speeches
  • Speeches in Parliament
  • Westminster News

Richard Fuller MP for North Bedfordshire

Footer

  • About RSS
  • Accessibility
  • Cookies
  • Privacy
  • About Richard
  • In Parliament
Conservatives
  • facebook
  • instagram
  • youtube_channel
Promoted by Katherine Arnold on behalf of Richard Fuller both at NBCA, Biggleswade Conservative Club, St Andrews Street, Biggleswade SG18 8BA
Copyright 2026 Richard Fuller MP. All rights reserved.
Powered by Bluetree