Skip to main content
Logo icon

Main navigation

  • The Economy
  • About
  • News
  • Campaigns
  • Surgeries
  • Policy and Campaign Responses
  • Contact
  • Nominate best local shop, pub or cafĂ©/restaurant
  • Events
  • facebook
  • instagram
  • youtube_channel
Logo icon

Richard asks National Highways about A1 improvements in light of expected house building at Tempsford

  • Tweet
Thursday, 13 February, 2025
  • Local News
Image of Richard Fuller MP's letter to National Highways re A1 improvements in light of expected housebuilding in Tempsford

With the increasing expectation that there will be significant housebuilding in Tempsford in coming years following the Chancellor's growth speech which announced the fast-tracking of a new mainline station there, Richard recently wrote to National Highways asking for clarity on their plans for the challenges facing the A1.

Richard Fuller MP said:

Realignment of the A1 and other measures to alleviate the congestion caused by the roundabouts on that stretch of road have long been discussed however other that the Black Cat redevelopment, nothing has been done to 'fix' the A1. With these impending developments at Tempsford sure to greatly exacerbate the existing problems, it is more important than ever that serious discussions are had to build a robust and sustainable plan to address current and future concerns.

I am pleased to read from their reply this week, that National Highways are working closely with government, and I hope this ensures that solutions for the A1 are developed and implemented alongside, if not ahead of the housing and train station developments. Too often required infrastructure lags behind house building, and with the added pressures on the A1 that the new station will bring, we cannot afford for that to be the case here.

I look forward to discussing this further when I meet with Martin in Parliament on March 5th.

The letter to National Highways can be read here. The reply from Highways can be read here.

Information on the Chancellor's speech and implications for North Bedfordshire can be read here.

Attachments

Attachment Size
Richard Fuller Letter to National Highways re A1 improvements in light of Tempsford housebuilding (182.64 KB) 182.64 KB
Reply from National Highways (38.98 KB) 38.98 KB

You may also be interested in

Image of Tempsford village Hall

Tempsford New Town

Following the July 2024 General Election, a think tank report recommended a new town be built at Tempsford, and the Government announced plans to expedite a new railway station there.
Black Cat Roundabout

The Black Cat Roundabout

The redevelopment of the Black Cat roundabout is an enormous engineering project that will allow North/South and East/West traffic flow without having to slow down or stop at the roundabout.  Planning consent for the project was granted in August 2022 but a legal challenge initially delayed the

Richard talks to local residents in Little Staughton about their concerns with East Park Energy solar plant

Thursday, 20 August, 2026
Richard recently visited the proposed site for East Park Energy and spoke to a number of residents about their concerns with this solar plant.Richard Fuller MP said:I enjoyed chatting with a number of local residents during my most recent visit to Little Staughton and you can see the whole video of

News

  • Podcast

Show only

  • Articles
  • Holyrood News
  • Local News
  • Newsletters
  • Opinions
  • Reports
  • Senedd News
  • Speeches
  • Speeches in Parliament
  • Westminster News

Richard Fuller MP for North Bedfordshire

Footer

  • About RSS
  • Accessibility
  • Cookies
  • Privacy
  • About Richard
  • In Parliament
Conservatives
  • facebook
  • instagram
  • youtube_channel
Promoted by Katherine Arnold on behalf of Richard Fuller both at NBCA, Biggleswade Conservative Club, St Andrews Street, Biggleswade SG18 8BA
Copyright 2026 Richard Fuller MP. All rights reserved.
Powered by Bluetree